The Brief: Streamline the corridor, replace worn paper displays, and reduce teacher workload with easy-to-update boards. Designs needed to reflect the school’s brand, values, vision, and motto—and inspire pupils to see their work on display.
The Process: Two Thirds Design returned to St James CE Primary to refresh the ground floor corridor, building on existing subject displays and introducing a cohesive, easy-to-maintain system of updatable boards aligned with the school’s identity.
The Result: Durable, reverse-printed acrylic boards with integrated snap frames for quick updates—securely fixed for a clean, polished finish.
Additional features included:
Client St James C of E Primary SchoolServices Design, Installation, Interactive, Print & Design Materials acrylic, foamex tokens, snap frames